Cheung Sha Wan Government Offices, Hong Kong
Year of Award: 1999
Scope of Services:
- Ammonia Chillers
Project Description
Cheung Sha Wan Government Office, a 19-storey building with 4 levels of basement car park, was completed in 1999. The building covers a land area of 4,600 square metres and provides a total gross area of about 55,000 square metres.
Customs Headquarters Building, North Point, Hong Kong
Year of award: 2010
Scope of Services:
- Building Services
Project Description
The Customs Headquarters Building, with a total gross floor area of about 41,000 square metres on 32 floors, is located at North Point and is the first headquarters building ever built for the Hong Kong Customs. The building houses more than 1,800 officers and civilians.
ICAC Headquarters, North Point, Hong Kong
Year of Award: 2007
Scope of Services:
- Target Mechanism and Garage Equipment
Project Description
Design, supply and installation of Professional Targetry Mechanism is one of our specialities. Apart from this ICAC Headquarters project, it has also been applied in many law-enforcement facilities in Hong Kong.
Kowloon City Law Courts Building, Kowloon City, Hong Kong
Year of Award: 2000
Scope of Services:
- MVAC System
- Electrical System
- Low Voltage Switchboard System
- Broadcasting Reception System
- Plumbing and Drainage System
- Sump Pump System
- CCMS
- Court Booking System
- Car Turntable System
Project Description
Kowloon City Law Courts Building is a replacement of the former San Po Kong Magistracy Building which was built in the early 1970s and had become inadequate in meeting the increasing court needs. The building is of 13-storey with a total floor area of more than 26,000 square metres on a land area of 2,780 square metres.
Inside the building, there are additional facilities for disabled persons, public witness waiting rooms and public consultation rooms, with more interview rooms in the custodial. The second to fourth floors are reserved for office purposes and the fifth to tenth floors house thirteen courts.
The building’s attractive outlook features energy-efficient and intelligent facilities. Barrier-free access is provided for the disabled. As a result, it becomes a truly multiple-purpose landmark in the district.
North Point Government Offices, North Point, Hong Kong
Year of Award: 1998
Scope of Services:
Design, Supply and Installation of
- ACMV System
- BMS
- Electrical & ELV System
Project Description
It is the first government building successfully registered under the Hong Kong Energy Efficiency Registration Scheme for Buildings.
The development comprises 25 storeys and one basement. The complex has a total floor area of approximately 68,000 square metres. The ACMV and Electrical Systems consist of:
- 3,200 TR indirect seawater cooled main chiller plant
- Seawater pumping station
- 960 TR emergency chiller plant
- CAV, VAV, VRV, fan coil units, CRU and DX A/C units air-conditioning systems
- Mechanical ventilation system
- 10,500kVA electrical installation
- Two 1,500kVA generator sets
- ELV system installation, including public address, security, CCTV, card access, broadcasting reception, drop arm barrier and water leakage detection system
Tuen Mun Siu Lun Government Complex, Tuen Mun, Hong Kong
Year of Award: 2018
Scope of Services:
- HVAC System
- Electrical System
Project Description:
Located in Tuen Mun, Siu Lun Government Complex is an integrated building which composed of two main blocks, namely the office and the recreational blocks, and are linked by an open-air communal atrium at podium level. It is a highly compact and efficient development that seamlessly integrates five Government Departments in order to provide a wide-variety of public services and recreational facilities in one-stop. A lot of communal space and recreational area is also provided within the Complex to promote a healthy lifestyle and encourage socialization for people of all ages.
The new sports centre occupies the second to fifth floors of the Complex has a total area of about 20900m². Full range of leisure activities in the building which is including a fitness room, a table-tennis room and a children's playroom on the 3rd and 4th floors, an outdoor sport climbing wall on the second floor, activity rooms on the fourth floor and a multi-purpose arena on the fifth floor opened in December 2019.
Police Headquarters Phase 3, Wan Chai, Hong Kong
Year of Award: 2002
Scope of Services:
- HVAC System
Project Description
The Hong Kong Police Headquarters Phase 3 is a 43-storey complex in Wanchai with a total floor area of 139,000 square metres, including a four-level basement. The HVAC System consists of:
- 5,850 TR indirect seawater cooled main chiller plant
- 2,286kW heating plant
- 900 TR emergency chiller plant
- Four-level basement smoke extraction system
- Staircase pressurisation system
- Mechanical ventilation system with total energy recovery wheels
- Air-conditioning system with CAV, VAV, VRV, fan coil units, CRU and DX A/C units
- Shooting range air-conditioning system
- IAQ level-one installation
West Kowloon Law Courts Building, Sham Shui Po, Hong Kong
Year of Award: 2014
Scope of Services:
- Building Services
Project Description
West Kowloon Law Courts Building is an 11-storey twin-tower courthouse located at Cheung Sa Wan, Kowloon. It covers an area of around 7,500 square meters and provides a total net operational floor area of about 18,000 square meters. There are 32 courts inside the courthouse. It is much larger than a standard courthouse in Hong Kong and has been referred to as the "mega court’" in local media.
Healthcare
South Kwai Chung Specialist Out-Patient Clinic, Kwai Chung, Hong Kong
Public Health Laboratory Centre, Shek Kip Mei, Hong Kong
Year of Award: 2000
Scope of Services:
- HVAC System
- Electrical System
Project Description:
Public Health Laboratory Centre is a 13-storey tall laboratory building comprising an office building and a large scale laboratory facilities with total GFA of approximately 42,500m². Due to the tight construction schedule of approximately 24 months, Southa adopted off-site fabrication of air duct including duct inculcation and pre-insulated pipe for chilled water and condensate drain pipe in the HAVC System. Although the material cost was relatively high, the installation time could be shortened. As a result, the overall cost could be saved in terms of time and labour involved. The significant benefit was to assure the workmanship and quality of installation as well as to have better site safety and site housekeeping as a result of having relatively less labour on site and less scarp material production during fabrication.
Princess Margaret Hospital, Kwai Chung, Hong Kong
Year of Award: 1996
Scope of Services:
- HVAC System
- Electrical System
- Operation Theatre
- Central CCMS for Kowloon West Cluster
Project Description:
Princess Margaret Hospital is the flagship public hospital with special focus on contagious diseases such as SARS, with special air-conditioning system for the operation theatres with state-of-the-art technology at the time of construction.
North Lantau Hospital, Tung Chung, Hong Kong
Year of Award: 2012
Scope of Services:
- Building Services
Project Description:
North Lantau Hospital is a public hospital in Kowloon West Cluster located at Tung Chung, Lantau Island. It covers an area of around 19,000 square metres. The main building of the hospital is a 7-storey crescent-shaped block. Upon full operation, the hospital will provide a total of 160 in-patient beds and 20 day beds, with a range of services including in-patient care, day hospital services and community nursing care. It is a hospital full of green features such as energy-efficient curtain walls and a podium garden.
Kwai Chung Hospital (Phase 2), Kwai Chung, Hong Kong
Year of Award: 2019
Scope of Services:
- Building Services
Project Description:
The new redeveloped of Kwai Chung Hospital will elicit the existing model of “whole-person” care, with the strengthening of community-based psychiatric care, reduction in avoidable hospital stay, provision of a less restrictive, more relaxed and homely environments for patients as well as a progressive shift toward co-ordinated and personalised treatment, recovery and community integration.
The scope of works comprises the design and construction of a new hospital campus, including to provide accommodation for a full range of psychiatric services with 1,000 in-patient wards and rehabilitation facilities, ambulatory centre, child and adolescent psychiatric services and other ancillary supporting facilities.
The total site area is approximately 30,000 square meters.
Hong Kong Sanatorium & Hospital Phase 3, Happy Valley, Hong Kong
Haven of Hope Hospital, Tseung Kwan O, Hong Kong
Year of Award: 1997
Scope of Services:
- Electrical System
- HVAC System
- Emergency Generator System
- Steam System
- Boiler Plants
- Central Control and Monitoring
- Extra Low Voltage
- Cold Room and Food Service Systems
- Low Voltage Switchboard
Project Description:
The Haven of Hope Hospital, a 425-bed rehabilitation-oriented hospital, covers an area of around 26,000 square metres. The project comprised a main building to accommodate in-patient beds and a low rise annex containing a nursing school, staff accommodation and a staff canteen. The beautiful architectural layout is one of the building's design characteristics but on the other hand it increased the complexity and difficulty in space utilisation, installation and maintenance of E&M services.
Industrial
Cathay Pacific Cargo Terminal
Year of Award: 2013
Scope of Services:
- Cold Store
- Refrigeration System
Project Description:
Cathay Pacific Cargo Terminal, a 7-storey building covering an area of about 110,000 square metres, is located at Chek Lap Kok Airport. The terminal, equipped with the most advanced cargo handling system, started operation in 2013.
HACTL Super Terminal 1, Hong Kong International Airport, Hong Kong
Year of Award: 1997
Scope of Services:
- Refrigeration Centres
Project Description:
Super Terminal 1 of Hong Kong Air Cargo Terminals Limited (HACTL), a 6-storey building covering an area of about 170,000 quare metres, is located at Chek Lap Kok Airport. It is the single largest multi-level air cargo terminal in the world.
Three independent refrigeration centres were designed, supplied and installed in Super Terminal 1, namely,
- Bulk Cargo Refrigeration Centre 1 (BCRC1) at south end, 1 /F
- Bulk Cargo Refrigeration Centre 2 (BCRC2) at south end, 2/F
- Unitized Cargo Refrigeration Centre (UCRC) at north end, 2/F
Each refrigeration centre, with its own refrigeration plant located next door, can operate independently. The three refrigeration centres consist of a series of -17.8°C freezer rooms, 1.7°C cold rooms and1.7°C lobbies.
Kerry Cold Store Phase 1, Kwai Chung, Hong Kong
Year of Award: 1991
Scope of Services:
- Refrigeration System
- E&M System
Project Description:
Kerry Cold Store Phase 1 consists of 20 cold rooms installed on 10 floors inside a twin-block 18-storey building with total gross area of approximate 61,000 square metres, which is situated at Kin Chuen Street, Kwai Chung.
This job was elected as one of the Ten Outstanding Projects by Hong Kong Air Conditioning and Refrigeration Association in 2001.
Kerry Cold Strore Phase 2, Kwai Chung, Hong Kong
Year of Award: 2011
Scope of Services:
- Refrigeration System
- E&M System
Project Description:
Kerry Cold Store Phase 2 consists of 8 cold rooms installed on 2 floors inside a 16-storey building with total gross area of approximate 46,000 square metres, which is situated at Wing Kei Road, Kwai Chung.
Nestle Dairy Farm Ice Cream Factory, Yuen Long, Hong Kong
Year of Award: 1994
Scope of Services:
Design, Supply and Installation of Complete Ammonia Refrigeration System serving the ice cream production and associated cold stores.
Project Description:
In the mid 1990s, Nestle joined with Dairy Farm, the most famous ice cream manufacturer in Hong Kong, and decided to build a modern facility in Yuen Long Industrial Estate for production. Southa was entrusted to design, supply and install the ammonia system to provide the necessary liquid overfed ammonia, glycol and brine to the confectionary chilling and freezing equipment. The latest screw compressors with advanced PLC control were employed in the plant. The total motor power of the compressors alone was close to 4,000kW.
This project is featured in the book "Cool HK", published by the American Society of Heating Refrigerating and Air-Conditioning Engineers.
Park'N Shop Fresh Food Distribution Centre, Sheung Shui, Hong Kong
Year of Award: 1992
Scope of Services:
- Cold Store
- Refrigeration System
- E&M System
Project Description:
Park’N Shop Fresh Food Distribution Centre, a 4-storey building located at Sheung Shui, was completed in 1991. Overall floor area is approximately 13,000 square metres. Pre-fabricated insulation panels was used as external wall in this multi-storey cold store.
Commercial Buildings
Crown Towers, City of Dreams
Year of Award: 2007
Scope of Services:
- Building Services
Project Description:
Crown Towers is the first oval-shaped building in Macau. It is a luxurious and modern 33-storey casino hotel providing around 300 guest rooms. It is one of the three hotels inside City of Dreams located at Cotai Strip, Macau.
Domain, Yau Tong, Hong Kong
Year of Award: 2011
Scope of Services:
- MVAC System
Project Description:
Domain, with total gross floor area of about 45,000 square metres, is a mega 8-storey shopping mall in Yau Tong. It is the largest one owned by Hong Kong Housing Authority. Domain was accredited with Excellent Award in Shopping Mall / Pedestrian Category of HKIA Cross-Strait Architectural Design Awards 2015.
Olympian City Phase 1, Tai Kok Tsui, Hong Kong
Cybercentre, Pok Fu Lam, Hong Kong
Year of Award: 2004
Scope of Services:
- ACMV System
- Electrical System
- Fire Services System
- Plumbing and Drainage System
- iBMS System
- Security Access Control System
- Special Lighting Fabric Roof System
- Automatic Irrigation System
Project Description:
Cybercentre is a five-storey shopping and amusement centre at Cyberport. The project comprises a shopping centre, a restaurant, a cinema and food court. The total constructed floor area is approximately 53,000 square metres. Due to a critically tight construction period, Southa adopted the following installation methods to minimise construction time:
- combined bracket system in back of house area
- pre-insulated chilled water pipe system
- pre-insulated air ducts
The 13, Macau
Year of Award: 2016
Scope of Services:
- HVAC System
- Plumbing and Drainage System
Project Description:
"The 13" is established by The 13 Group as a new standard for luxury hotels by seeking to recapture the values of a golden age. The 23-storey hotel with total gross floor area of around 88,000 square metres, located at Cotai Strip, Macau, covers an area of around 6,000 square metres and provides 200 all-villa rooms.
The Peak Galleria, The Peak, Hong Kong
Year of Award: 2009
Scope of Services:
- Electrical Service and Power Supply System
- Emergency Generator System
- Low Voltage Switchboards and Extra-low Voltage System
Project Description:
The Peak Galleria is now one of the landmarks for tourists visiting Hong Kong. It is a 4-storey shopping mall complex, at more than 400 metres above sea level with a land area around 12,000 square metres, providing excellent shopping and catering facilities. There is also a spectacular view of the Hong Kong skyline on the podium and top doors. A dancing fountain in front of the main entrance attracts children and visitors.
Leisure
M+ Museum, West Kowloon, Hong Kong
Year of Award: 2015
Scope of Services:
- HVAC System
- Plumbing and Drainage System
Project Description:
M+ Museum is the new museum of visual culture in Hong Kong, as one of icon in the West Kowloon Cultural District, focusing on the 20th and 21st century art, design and architecture and moving image. The building consists of plenty of functional areas including exhibition and performance spaces, cinemas, lecture theatre, learning centre and mediatheque.
The Sea Water Cooled District Cooling System for supplying chilled water for air conditioning to the entire M+ area, supply equipment and carry out installations for the HVAC system and plumbing system for the buildings.
East Kowloon Cultural Centre, Ngau Tau Kok, Hong Kong
Year of Award: 2020
Scope of Services:
- E&M System
Project Description:
The East Kowloon Cultural Centre (EKCC) is located at the junction of Ngau Tau Kok Road and Kwun Tong Road. The centre will house five performance halls including a 1,200-seat multi-purpose hall and a 550-seat theatre, which could make the best use of the site to provide vibrant cultural facilities and services, as well as public open spaces to the community.
Tseung Kwan O Sports Ground
Year of Award: 2009
Scope of Services:
- E&M System
Project Description:
Tseung Kwan O Sports Ground is a multi-purpose sports ground and home of Hong Kong Premier League club Eastern. It was the main venue for track and field events for the 2009 Hong Kong Games, 2009 East Asian Games and 2011 Hong Kong Games.
Occupying an area of about 5.9ha, it comprises the main sports ground, a warm-up secondary sports ground, and other facilities for holding large-scale international competitions. Its track and field facilities conform to International Association of Athletics Federations standards. It is located adjacent to the Hong Kong Velodrome.
Hong Kong Film Archive & Island East Sports Centre, Sai Wan Ho, Hong Kong
Year of Award: 2001
Scope of Services:
- Cold room
- HVAC System
- Electrical System
- ELV System
- Genset
Project Description:
The project comprises the Island East Leisure Centre and the Hong Kong Film Archive in separate buildings with a common car park basement. The Leisure Centre is a 6-storey build ng comprising a sports arena, leisure and training pool, a table tennis room, an indoor bowling green, a dancing room and a fitness room. The Film Archive is a 6-storey building comprising an exhibition hall, a cinema, a film library, a film store, a studio and other supporting facilities.
Inside the Film Archive, a four-floor film cold store with low humidity and low temperature conditions was built to store movie tapes, films and negatives.
Lei Yue Mun Park and Holiday Village Chai Wan, Hong Kong
Year of Award: 2005
Scope of Services:
- Slurry Ice Air-Conditioning System
Project Description:
This is a pilot project for an air-conditioning system with thermal storage of slurry ice built at the canteen in Lei Yue Mun Park. Slurry ice is liquid pumpable ice with suspension of very small ice crystals in a water/ethanol solution, which is produced by a special machine and stored in a fiberglass tank. A special additive is used to prevent agglomeration of ice crystals. The slurry ice solution is then pumped directly to the fan coil units on cooling demand when the fan coil units are switched on.
Tsing Yi Southwest Leisure Building, Hong Kong
Year of Award: 2022
Scope of Services:
- HVAC System
Project Description:
Tsing Yi Southwest Leisure Building was officially opened 5 December 2017. The building occupied a total area of about 6,700 square metres. Equipped with a sports centre and an indoor swimming pool, the building provides Kwai Tsing District residents with quality recreational and sports facilities, including indoor ball courts, a children's play room, an outdoor climbing wall and a heated swimming pool.
Tsing Yi Southwest Swimming Pool situated on the first floor of the building is the first indoor heated swimming pool in Kwai Tsing District and is open all year round. Residents of the district can enjoy swimming even in winter. The pool measures 25m by 15m and has 6 swimming lanes.
Festival Walk Ice Rink, Kowloon Tong
Year of Award: 1997
Scope of Services:
- Ice Skating Rink
Project Description:
The largest ice skating rink in Hong Kong is located at Festival Walk Shopping Mall in Kowloon Tong. Its area is around 1,200 square meters. It serves both recreational skating and hockey matches.
A plant of three glycol chillers with remote air-cooled radiators as the heat rejection equipment is installed. -15°C glycol is pumped through field embedded in the rink floor, on which ice sheets are formed. Sub-floor heating pipes are embedded to prevent condensation on the ceiling of the floor below.
Infrastructure
Wo Hop Shek Crematorium
Year of Award: 2019
Scope of Services:
- Cremators and Emission Control System
Project Description:
This is an expansion project to provide two new cremators for commissioning in 2023, adding about 3800 cremation sessions per annum.
The design and operation of these new cremators will be fully computerised, using advanced technologies. It will be installed with an advanced flue gas filtering system to process and filter out waste gases and particles generated during the combustion process, and will also be fitted with a high temperature secondary combustion chamber to ensure completion of combustion during the cremation process.
The above design was adopted for the new cremators at other cremator reprovisioning projects completed in recent years, such as Cape Collinson Crematorium. It has proven effective in reducing the emission of particles/waste gases, dark smoke and mercury as well as meeting the statutory environmental standards. The new cremators will be equipped with a computer system to record their emissions. The system is connected to EPD for real-time and comprehensive monitoring to ensure that waste gas emissions are in full compliance with the air quality standards.
Liantang/ Heung Yuen Wai Boundary Control Point, Ta Kwu Ling, Hong Kong
Year of Award: 2015
Scope of Services:
- HVAC System
- Electrical System
Project description:
The Heung Yuen Wai (HYW) Boundary Control Point (BCP) was officially open 26 August 2020. The Liantang Port/Heung Yuen Wai Boundary Control Point is the seventh land-based control point at the Hong Kong-Shenzhen boundary. It is named HYW BCP in Hong Kong and Liantang Port in Shenzhen.
The project involves a passenger terminal building and nine other main ancillary buildings, including fire and police bases, vehicle examination buildings and fitting-out and building services installation of the border crossing pedestrian bridge up to the Hong Kong - Shenzhen administrative boundary. The total floor area is approximately 157,400 sqm.
Fire and Ambulance Services Academy, Tseung Kwan O, Hong Kong
Year of Award: 2016
Scope of Services:
- Live Fire Fighting Trainer
Project Description:
Fire and Ambulance Services Academy, situated at Tseung Kwan 0, covers an area of 158,000 square metres, and provides 526 residential training places for both newly recruited and serving fire and ambulance personnel. The diversified and advanced simulation training facilities of the Academy enhance Fire Services Department personnel’s professional knowledge and rescue techniques in handling incidents involving railway, tunnel, vessel, aircraft and fueling facility. The specialized training facilities for high angle rescue, urban search and rescue and compartment fire behaviour training strengthen the Fire Services Department personnel's capability of tackling large-scale incidents. In addition,fire and ambulance personnel will have more opportunities to be trained together, hence improving their response and coordination capability in emergencies.
West Kowloon Rescue Training Centre, West Kowloon, Hong Kong
Year of Award: 2006
Scope of Services:
- Live Fire Fighting Trainer
- Rescue Training maze and Tunnel
- Physical Condition Tester
- HVAC, Electrical and Fire Service Systems
Project Description:
West Kowloon Rescue Training Centre is the first of this kind in Hong Kong and one of the most advanced in Asia. Live fire fighting training chambers simulating various scenes commonly encountered and rescue training maze are all of the latest world-class technology, contributing to the safety of both our fire fighters and citizens.
Hong Kong-Shenzhen Western Corridor, Hong Kong
Year of Award: 2005
Scope of Services:
- HAVC System
- Electrical System
- Fire Services
Project Description:
Hong Kong-Shenzhen Western Corridor is a road-bridge system connecting Hong Kong to the western part of Shenzhen, including the Shenzhen Bay Bridge. Both passengers and logistic operators will find this route a very convenient alternative to the other highly congested ways.
Mid-levels and Central Escalator Link, Central, Hong Kong
Year of Award: 1993
Scope of Services:
- Electrical Services & Power Supply System
- Plumping System
- Ventilation System
Project Description:
The Mid-Levels and Central Escalator Link is the world’s longest escalator system and was opened to the public in 1993. It is about 800 metres long and consists of 20 escalators and three travelators, which provide an economical and convenient direct route between Conduit Road in the Mid-Levels and Central. More than 36,000 commuters use it every day. The link not only reduces the traveling time between the Mid-levels and Central but also reduces vehicle traffic and thus improves air quality.
Shatin To Central Link - To Kwa Wan Station
Year of Award: 2014
Scope of Services:
- Building Services
Project Description:
To Kwa Wan Station is an underground MTR station with 4 nos. ground floor entrances, located in the densely populated Kowloon City; underneath Ma Tau Wai Road between Lok Shan Road and Chi Kiang Street. The station consists of Lower Platform, Mezzanine, Upper Platform, Concourse, Ground and Roof Level, it gives Total GFA approximate 21,000m².
MTR Tai Wai Depot, Tai Wai, Hong Kong
Year of Award: 2002
Scope of Services:
- Environmental Control System
- Electrical System
- Building Automation System
- Fire Services System
- Compressed Air System
Project Description:
MTR Tai Wai Depot operates 24 hours a day for all maintenance works of the trains in Ma On Shan Line. The building consists of a running maintenance area, a heavy maintenance area, a stabling area, emergency vehicle access, administration buildings and workshops. A lot of special systems have been provided to meet maintenance needs. These include the Ma On Shan Signaling & Train Control System Traction Power & Overhead Line System Integrated Control & Communication System, Radio System, Station & Depot Communication System, Automatic Revenue Collection & Electronic Access Control System, Lift System, Electro-motive Unit System, Train Wash Plant, Environmental Control System, Electrical System, Building Automation System, Fire Services System, Plumbing & Drainage System, Compressed Air System and Town Gas Supply System.
Residence
The Floridian, Quarry Bay, Hong Kong
Year of Award: 1997
Scope of Services:
- MVAC System
- Electrical System
- Building Management System
- Emergency Generator System
- Low Voltage Switchboards
- CCTV System
- Security and Burglar Alarm System
Project Description:
The Floridian, located at Sai Wan Terrace, Quarry Bay, is a premium twin-tower residential development of 22 and 24 storeys housing 214 units. It is the first private residential development in Hong Kong installed with Hong Kong Telecom Superior Wiring System and four-in-one sockets in all its units to enhance telecommunications transmission and to cater for future communications needs such as interactive television services. The club house provides a wide range of facilities, including a gym, a golf practice room, a billiards room, a children's activities and music room, a table-tennis and multi-purpose room, an aerobics room and a sauna. An outdoor swimming pool, a landscaped garden and a playground are also provided for the residents to enjoy.
Nova Grand, Macau
Year of Award: 2017
Scope of Services:
- HVAC System
- BMS System
Project Description:
Nova Grand is a premier section in Taipa with a gorgeous sea view of Praia Grande and a magnificent landscape view of Taipa Central Park. It comprises 8 towers with 40 to 44 storeys offering a total of 1,775 quality apartments and comprises a Lifestyle Mall in Macau. The world-class landscaped Clubhouse includes a gym, swimming pool, cinema, spa, children's play area and internet café.
Sau Mau Ping Disciplined Services Quarters, Kwun Tong, Hong Kong
Year of Award: 2002
Scope of Services:
- MVAC System
- Electrical System
- Emergency Generator System
- Low Voltage Switchboards
- CCTV System
- Security and Burglar Alarm System
- Public Address System
- Broadcasting Reception System
- Plumbing & Drainage System
Project Description:
Sau Mau Ping Disciplined Services Quarters, located at Hong Ning Road, Kwun Tong, is a twin-tower residential development providing 584 units for the disciplined services departments. The 37-storey Tower 1 and 36-storey Tower 2 each offers 8 grade-G and grade-F units per floor respectively. The towers share a three-level podium housing main entrance and lift lobbies, car parking spaces, a children’s playground, a landscaped garden, a residents' club house and a roof garden above the club house.
Education
CUHK Library New Wing, ShaTin, Hong Kong
Po Kong Village Road School Village, Wong Tai Sin, Hong Kong
Year of Award: 2002
Scope of Services:
- MVAC System
Project Description:
The government introduced the "school village" concept in order to improve learning environment and to make better use of facilities through sharing. Po Kong Village Road School Village located at Diamond Hill is the first school village in Hong Kong. The area of this village is about 37,500 square metres and accommodates 3,000 students in 4 schools, namely,
- Po Leung Kuk Celine Ho Yam Tong College
- Po Leung Kuk Grandmont Primary School
- St. Patrick's Catholic Primary School
- Tsz Wan Shan Catholic Primary School
Each school has its own basketball courts while two additional covered basketball courts, a football field and running tracks are provided for the schools to share. This concept not only increases the effectiveness of land use but also provides an ideal learning environment for students.
University of Macau, Macau
Year of Award: 2013
Scope of Services:
- Wet Laboratory
- Dry Laboratory
- Animal Laboratory
Project Description:
The University of Macau is the only public comprehensive university in Macau. Its predecessor was the private University of East Asia which was renamed the University of Macau in 1991. In 2014, it was relocated from the old campus in Taipa to the new campus in Hengqin Island, which covers an area of about one square kilometres.